Tuesday, April 29, 2014

sans mosquito


I've been really enjoying this lovely weather sans mosquito. Savoring these kinds of days.






Wednesday, April 23, 2014

Monday, April 14, 2014

memorize

This is a super lame post and probably won't make any sense but I have to have these memorized by Tuesday... posting notes here since my desk is such a hot mess right now.

Level two: Actual Results; Flexible Budget Variance; Flexible Budget; Sales Volume Variance; Static Budget

Level three: Actual Costs Incurred; Price Variable; Actual Input Quantity x Budget Price; Efficiency Variance; Flexible Budget (Standard Quantity x Standard Price)

Three-Variance analysis: Actual Costs Incurred; Spending Variance; Actual Input Quantity x Budgeted Rate; Efficiency Variance, Flexible Budget, Production Volume Variance, Allocated

NOTE:

When calculating Three-Variance Analysis for Variable Manufacturing Overhead there is never a production volume variance

When calculating Three-Variance Analysis for Fixed Manufacturing Overhead there is never a flexible budget variance


Friday, April 11, 2014

he is him

My sister is dating the real life Flint Lockwood... no not Bill Hader.






Thursday, April 10, 2014

oh nos



Psyched for her new album

Tuesday, April 1, 2014

Touch

EMILY BIONDO & BRADFORD BARR: TOUCH ME


Opening this Friday at 5pm at Flashpoint Gallery and up till May 10th.